Hi Henrik
I'm trying to use Hobbit 4.1.2 in report-generation mode, as I was doing previously with bbgen 2.x / 3.x, but I'm having a strange problem with start & end dates...
Here's my command line :
START=`date +%s --date="01 sep 2005 00:00:00"`
END=`date +%s --date="30 sep 2005 23:59:59"`
/hobbit/server/bin/bbcmd --env=/hobbit/server/etc/hobbitserver.cfg \
bbgen --reportopts==$START:$END:1:all \
--subpagecolumns=2 \
--pages-last \
--pagetext-headings \
/hobbit/server/www/reports-test/
The report is built from august, 9 to october, 25. Is there something I'm not doing the right way ?
Thanks in advance.
--
Frédéric Mangeant
Steria EDC Sophia-Antipolis